La Sagrera Park, Barcelona

Image Gallery
Prev Next
parque la sagrera parque la sagrera parque la sagrera
parque la sagrera
parque la sagrera
parque la sagrera
  • Client: BARCELONA SAGRERA ALTA VELOCITAT (BSAV)
  • Country: Spain
  • Start date: 2012
  • Ending date: 2012
  • Investment: 52.797.150 €
Download datasheet

La Sagrera Park, in Barcelona, Spain.

The aim of the project is the development of infrastructure services of the new la Sagrera park, promoted by Barcelona Sagrera high speed (BSAV) and is part of the architectural project drawn up by RCR - WEST8 - ALDAY JOVER.

The new la Sagrera park will become the backbone of a great urban operation of 160 hectares with housing for 25,000 new residents and 30,000 new workspaces. With the arrival of the high speed train and the construction of the new la Sagrera station, the opportunity has been taken to cover the tracks and create this green space on top of nearly 40 hectares.

Economic benefits

Reduction of power consumption thanks to the following actions:

  • Efficient lighting design.
  • Detection of presence, Twilight probes and schedule control in lighting.
  • Variable speed pumping engines.
  • Connection to the District Heating & Cooling network.
  • Rain-sensing and control the need for irrigation.

Reduction in the consumption of potable water through the following actions:

  • Use of groundwater for irrigation and ornamental fountains.
  • Reduction of Natural Gas consumption thanks to the following actions:
    • Connection to the District Heating & Cooling network.
    • Solar thermal collection in locker room sports tracks.

Environmental benefits

  • Reduction of the heat island effect, due to the green area of the Park.
  • Reducing CO2 emissions, due to the actions described in the previous section.
  • Reduction of runoff due to increased and vegetation characteristics and natural drainage system holding capacity.

Social benefits

It is the largest park built in Barcelona connecting two neighborhoods traditionally separated by the railway.

Operational objective and carried out works

The work carried out by SENER integrates pre-project phases, concept design, detailed design, site supervision and project management:

  • Director Plan of civil engineering works.
  • Installations of electricity, telecommunications, security, district heating & cooling, natural gas, ground water and potable water and sanitation.