Infrastructure and Transport

SENER offices in Madrid (building 9, Tres Cantos)

Image Gallery
Prev Next
Edificio 9 Tres Cantos Edificio 9 Tres Cantos Edificio 9 Tres Cantos
Edificio 9 Tres Cantos
Edificio 9 Tres Cantos
Edificio 9 Tres Cantos
  • Client: SENER
  • Country: Spain
  • Start date: 2011
  • Ending date: 2011
  • Investment: 3.888.823 €
Download datasheet

The constant growth of personnel that has been taking place in SENER's offices in Madrid in recent years has resulted in the need to build a new building (number 9), which is mainly intended for office space.

This new building has four floors and maintains the same design as the existing buildings that make up the SENER facilities.

The basement floor connects directly with the new underground parking lot, which contains almost 500 places and also has spaces for facilities, a data processing center and a security control center.

The new building also has a direct connection, at ground floor, with the rest of the complex through the building 7, the nearest to the new building.

Regarding its design, each of the floors of building 9 is developed around a central core in which are located the vertical communications, the stairs and the elevator, as well as the toilets and storage. Most of the space is allocated to office space, with an open plan office concept, which also allows for some closed offices and meeting rooms in each floor of the building. On the ground floor, the building has several meeting rooms equipped with the latest technological advances.

The structure and the facades have been made with elements of prefabricated concrete.

  • Scope:
  • Conceptual Design
  • Geotechnical Survey
  • Preliminary Design of Architecture, Structure, Electrical, Mechanical and Data Building services
  • Detailed Design of Architecture, Structure, Electrical, Mechanical and Data Building services
  • Geothermal Project
  • Public realm design and access
  • Site Supervision
  • Waste management Plan
  • Quality Control Plan
  • Study and following-up of the work programme
  • Document Control
  • Budget monitoring
  • Support for supplementary and modified projects.
  • Coordination of multidisciplinary teams
  • Health and Safety Coordination